The Momentum Papers · Calculator

The Momentum Tax calculator

Pick a junction, turn the dial to its speed limit and set the traffic. See what one junction wastes every year in energy, carbon, people’s time and collisions, valued the way the State values them. Switch to USA for mph, dollars and US DOT values.

Region and appraisal values
Junction type
Speed limit
Speed ramps

Turn a dial, click a number, or use the arrow keys. Ramps go up to two either side, and only up to 60 km/h, as on real roads.

4,000vehicles a day, both directions40,000

Adjust this junction

10km/h, how slowly traffic crawls over a ramp30
5% 100%
5 s 90 s
0%rigid and articulated lorries; cars and vans rebalance40%
€1.50per litre, petrol and diesel€2.50
Use this junction’s collision record

Enter the average a year from RSA or Garda records. Leave at zero to use the indicative PAG average.

Momentum Tax at this junction––
    –energy wasted, well to wheel
    –carbon emitted, well to wheel
    –hours of people’s time lost
    –litres of fuel burned

    What is counted at this junction

    Every vehicle passing pays some of these. A free-flow junction removes all of them.

    EventWhat happensWho it applies toCounted here

    Each event is net of the fuel a vehicle would burn anyway, cruising the same distance at the speed limit.

    The same junction at every speed limit

    The selected speed limit is highlighted. Faster roads carry more energy into every stop, so the Momentum Tax rises with speed. Speed ramps are left out above 60 km/h, where they are not used on real roads.

    Energy wasted a year, GWh well to wheel
    Momentum Tax a year, € million
    Carbon a year, tonnes CO₂ well to wheel

    How it is calculated

    For each vehicle class (cars, vans, rigid lorries and articulated lorries, at average operating masses) the model works out the energy needed to get back up to speed after every slowdown, the fuel burned waiting, and subtracts what the vehicle would have used anyway. Stop share and waiting time at signalised junctions come from the signal timing, using Webster’s method, the standard traffic engineering formula. Energy is counted well to wheel, including the energy used to produce and deliver the fuel.

    What is PAG?

    The Project Appraisal Guidelines (PAG) are Transport Infrastructure Ireland’s rules for valuing the costs and benefits of road schemes. Unit 6.11 sets the official values every Irish scheme must use: what an hour of travel time is worth, the shadow price of a tonne of carbon, and the cost to society of a collision by severity. They are set in 2016 prices and grown each year in line with the economy; this calculator uses 2026 values. Using PAG means the Momentum Tax is valued the way a council, TII or the Department of Transport would value it when deciding whether to fund a scheme.

    ItemValue usedSource
    Value of travel timeabout €15.70 per person-hour, 1.4 people per vehiclePAG Unit 6.11, Table 6.11.9, blended across work, commuting and other trips (trip mix assumed)
    Shadow price of carbon€346 per tonne (2026)PAG Unit 6.11, Table 6.11.6
    CollisionsIndicative PAG average for the speed limit, or the site record if entered; 75% assumed removed by a free-flow junctionPAG Unit 6.11, Tables 6.11.20, 6.11.22 and 6.11.23
    Fuel supply energy19% added for extraction, refining and deliveryConsistent with the EU JEC Well-to-Wheels study
    Signal timing90-second cycle, two stages; a 20-second pedestrian stage for the all-red typeAssumption; replace with the council timing plan for a real site
    Ramped crossingTwo ramps, 30% of vehicles stop, 15-second wait, 15 km/h over each rampAssumption
    Extra rampsBetween ramps on the same side, traffic regains the same speed it reaches after the first rampAssumption, extending the workbook to up to four ramps
    Traffic mix73% cars, 12% vans, 7% rigid and 8% articulated lorries at average operating massesWorkbook defaults; the slider changes the lorry share
    Modelled, not measured. Figures are approximate and follow Umpireal’s Junction Energy Loss Model v21. They describe a typical junction of each type; a real site needs its own traffic counts, signal timings and collision record. See our facts page.